Riparian Woodland Creation


Riparian Woodland Creation
Case Study

Located just a few miles West of Peebles, Edston, Upper Kidston and Lyne Farm cover a collective area of around 1,500 ha and sit along prominent stretches of the Tweed and Lyne Water as well as a number of smaller watercourses. Focusing on livestock production, these farms are predominantly a combination of improved in-bye grass fields and unimproved rough hill grazing.

In 2021, a total of 32.49ha of native riparian woodland was planted across all three farms, in 15 separate compartments. The planting focused on the riparian zones as much as possible, helping to exclude livestock from the watercourses while creating wildlife corridors through the landscape. In total, 44,316 trees were planted with a wide variety of species, all designed to grow well in the Peebleshire countryside. Species included: Alder, Aspen, Downy Birch, Bird Cherry, Pedunculate oak, Rowan, Scots Pine, Goat Willow, Grey Willow, Hawthorn, Hazel, and Holly. As a result of this single project, over 4.1km of water course has now been buffered from livestock by riparian woodland planting and over 8.3km of new stock fencing was installed across all three farms.

Breakdown by species: Edston Lyne Upper Kidston Totals
Alder (Alnus glutinosa) 3427 2320 5033 10780
Aspen (Populus tremula) 571 387 1259 2217
Downy Birch (Betula pubescens) 1999 1358 6292 9649
Bird Cherry (Prunus padus) 571 390 1259 2220
Pedunculate Oak (Quercus robur) 857 528 1259 2644
Rowan (Sorbus aucuparia) 0 0 3774 3774
Scots Pine (Pinus sylvestris) 571 399 1259 2229
Goat Willow (Salix caprea) 1143 775 0 1918
Grey Willow (Salix cinerea) 1143 775 2518 4436
Hawthorn (Crataegus monogyna) 343 236 1259 1838
Hazel (Corylus avellana) 458 315 1259 2032
Holly (Ilex aquifolium) 343 236 0 579
44316

Below is evidence of the impact of creating a riparian woodland in a short period of time across these sites, with a high rate of trees establishing successfully.

  • Before
    After

    Edston site looking North capturing one year of growth from 2025 to 2026.

  • Before
    After

    Planting a riparian woodland at Lyne - 18 months of progress.

This project was made possible by funding from the National Lottery Heritage Fund, Scottish Government Forestry Grant and a range of Trusts and Foundations.

Back to Woodland for Wildlife & Water project page